Post #18 - Kerfings installation for top.
Since clean up of back can be done through the soundhole, I'm installing the soundboard first. This way so glue clean up of the top can be done before the back is installed. Below are pics of the top kerfings being installed using glue and clamps/clothespins. You'll note rubber bands for each clothespin to provide greater clamping pressure.


No comments:
Post a Comment
Note: Only a member of this blog may post a comment.